Flagship project · Abia State, Nigeria
Abia Solar Manufacturing: 25MW to 800MW, in disciplined phases
An industrial renewable energy initiative of Onwuka Global Ventures Ltd, established to manufacture solar photovoltaic modules locally for Nigerian and regional demand.
Project overview
Why this project, in this location
Nigeria's installed solar ambition is constrained by an almost entirely imported module supply chain — exposing developers to freight cost, currency volatility and delivery risk. Abia Solar Manufacturing addresses that constraint directly by establishing module assembly capacity within the country.
Abia State offers the combination the project requires: available industrial land, an established artisanal and technical labour base, and access to southern and eastern distribution corridors.
Capacity is added in modular increments so that each expansion is financed against demonstrated demand and operating performance.
Manufacturing capacity
25MW pilot, 800MW platform
25MW
Phase 1 annual capacity
200MW
Phase 2 annual capacity
800MW
Phase 3 target capacity
50–100MW
Increment per additional line
OEM engagement
Technology partners and process transfer
- Line equipment sourced from established module manufacturing equipment suppliers.
- Commissioning, calibration and process transfer contracted as part of supply.
- Operator and maintenance training delivered before first commercial production run.
- Spare parts continuity and remote diagnostic support secured for the asset life.
ESG & sustainability
Impact measured, not asserted
Displacement
Climate
Modules deployed to displace diesel generation across commercial and mini-grid loads.
Skilled roles
Employment
Technician and supervisory positions filled from Abia State and surrounding communities.
Managed
Environment
Glass, aluminium and packaging waste streams segregated and recovered where feasible.
Audited
Governance
Project reporting consolidated into the group governance and compliance framework.
Economic impact
What the project produces beyond modules
Industrial employment
Supplier development
Timeline
Phased delivery schedule
Phase 0
Site preparation and technical evaluation
Land servicing, OEM shortlisting, utility interface design and statutory permitting.
Phase 1 — 25MW
Pilot line commissioning
Single assembly line installed and commissioned, operator cohort trained, quality laboratory established, first commercial deliveries executed.
Phase 2 — 200MW
Capacity expansion
Additional modular lines installed in 50–100MW increments, warehousing extended, local supplier base developed.
Phase 3 — 800MW
Regional platform
Full-scale plant operating at target capacity with structured export supply into ECOWAS markets.
Project contact
Offtake, technology and investment inquiries relating to Abia Solar Manufacturing are handled directly by the project team.